Sunday, July 19, 2009

Train Mountain Part 2

As we leave the station and run through several divisions of the railroad to the area on the north side of the highway, we pass other trains and various buildings along the way. Below is a group of guys getting their engines all steamed up.



Some of the larger scaled trains that are able to run on the 7.5-inch gauge track can carry a person inside.





Well, now that our train has passed the inspectors and have a green light on the signal bridge, we can proceed out onto the main line and start moving along at a maximum of 7 MPH. Railroad Mountain has a very good set of safety rules in place to keep all the trains and passengers safe.



So here we go!



We came upon an industrial area.





Then we headed for the tunnel under the highway, NEXT TIME.

No comments:

Post a Comment